コンテンツにスキップ

英文维基 | 中文维基 | 日文维基 | 草榴社区

ファイル:Elevated structures in Longos and Burol Primero Balagtas station 08.jpg

ページのコンテンツが他言語でサポートされていません。

元のファイル (5,167 × 3,178 ピクセル、ファイルサイズ: 4メガバイト、MIME タイプ: image/jpeg)

概要

解説
English: These are photos of elevated railway structures of Balagtas station (a 2-storey at Km. 23+208 with 180 meters platform) in Sitio Karuyan, Longos and Burol Primero, Balagtas, Bulacan. Construction of embankment, bored pile foundation, span-by-span viaduct and PC box girder bridge. The elevated dual-track system is standard-gauge; the 38-kilometer PNR Clark Phase I project includes a 14-kilometer long viaduct of the piers (connected by the Span by Span with 22 spans foundation works completed and Balanced Cantilever Construction Method using precast concrete box girders of 60 to70 tons each cast here in Calumpit Yard). Sumitomo works upward for structural works with remaining launching gantries with a 50-meter span having started. Enbankment - reinforced -soil railway structure with rigid facing RRR, bored pile foundation, viaduct span-by-span, PC Box Girder Bridge.
日付
原典 投稿者自身による著作物
作者 FBenjr123

ライセンス

この作品の著作権者である私は、この作品を以下のライセンスで提供します。
w:ja:クリエイティブ・コモンズ
表示 継承
このファイルはクリエイティブ・コモンズ 表示-継承 4.0 国際ライセンスのもとに利用を許諾されています。
あなたは以下の条件に従う場合に限り、自由に
  • 共有 – 本作品を複製、頒布、展示、実演できます。
  • 再構成 – 二次的著作物を作成できます。
あなたの従うべき条件は以下の通りです。
  • 表示 – あなたは適切なクレジットを表示し、ライセンスへのリンクを提供し、変更があったらその旨を示さなければなりません。これらは合理的であればどのような方法で行っても構いませんが、許諾者があなたやあなたの利用行為を支持していると示唆するような方法は除きます。
  • 継承 – もしあなたがこの作品をリミックスしたり、改変したり、加工した場合には、あなたはあなたの貢献部分を元の作品とこれと同一または互換性があるライセンスの下に頒布しなければなりません。

キャプション

このファイルの内容を1行で記述してください
Elevated structures in Longos and Burol Primero Balagtas station

このファイルに描写されている項目

題材

30 11 2021

0.00625

14.053 ミリメートル

ファイルの履歴

過去の版のファイルを表示するには、その版の日時をクリックしてください。

日付と時刻サムネイル寸法利用者コメント
現在の版2021年12月7日 (火) 08:252021年12月7日 (火) 08:25時点における版のサムネイル5,167 × 3,178 (4メガバイト)FBenjr123Uploaded own work with UploadWizard

以下のページがこのファイルを使用しています:

メタデータ